Pollution Control Board


*This package covers only one Tax Return

Central Pollution Control Board (CPCB) that comes under the Ministry of Environment, Forest and Climate in India works for checking the air, water, and noise pollution by ensuring the quality is maintained. It also issues guidelines for the purpose. Additionally, every state has its own Pollution Control Boards.

Package Details

Any and every industry, operation or process which may result in the discharge of sewerage into the environment and if is likely to emit any substance into the environment that may cause any form of pollution mandatorily has to obtain a consent from the State Pollution Consent Board. This consent is as per the Water (Pollution & Control of Pollution) Act, 1974 and Air (Pollution & Control of Pollution) Act, 1981.

In a similar manner, the industries or processes which generates, stores, dispose of, transports, or handles any hazardous waste as per the Hazardous waste (Handing and Management) Rulesmust obtain authorization from the State Pollution Control Board.

Our Process

  • Sign Up on Haxtax.com.
  • Send your Documents 
  • Document submission .
  • Documents varification.
  • Relax and seet back ,we will follow up with you .
  • Do not forget giving your feedback 

Documents Needed

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standar

  • A location plan or site plan of the industry.
  • A Proprietorship Certificate, Partnership Deed, Memorandum or Article of Association as applicable to the industry, operation or process.
  • Valid documents of the land like Jamabandi, Registration deed or Lease Deed indicating specific details of the property.
  • Brief Project Report with a flow chart indicating the Manufacturing Process.
  • Compliance report of any previous Consent to Operate granted to the entity.
  • Undertaking that the proposed site is located in the designated Industrial area as notified and the plan of the establishment is permissible. It should also indicate the detailed revenue entries.
  • Other documents as per the State in which it situates, the location, activity etc
  • Any industry specific documents or certificates.
  • For a renewal application, a Request Letter must be submitted giving the reason for non-completion of the project in the time as stipulated earlier along with the current status.

FAQ

  • Lorem Ipsum?is simply dummy text of the printing

For Enquiries

or

Call : 7505111555